Factory price high quality ceramics drop-out fuse box and fuse cutout
Overview: (H)RW11-12 Type ac high voltage drop-fuse to be connected with in coming feeder of distributing transformer or distribution lines it mainly protect transformer or line from short circuit and overload and on/off loading current, provide reliable protection from low level, overloads that just melt fuse link, intermediate faults, through maximum interrupting capacity.
Service conditions: 1. Ambient Temperature: -40℃~+40℃ 2. Altitude: ≤1000m 3. Wind speed: ≤34m/s 4. Installation site: location where is no flammable and explosive substance, pollution,chemical corrosion and intensive vibration.
Instructure: Fuse is composed of base and arc suppression device of two parts, arcing pipe bottom is equipped with possible rotation of the spring bracket, always make the fuse in nervous condition to ensure that the arcing takes in the closing position self-locking, circuit and transformer overload or short circuit the blown fuse pumped rapidly from arcing takes arcing design for exhaust type step by step to solve the breaking size on the same fuse current contributions.
Technical parameters:
Type
Rated voltage(KV)
Rated Current(A)
Rated Cut-off Current(KA)
Deciliter Load Current(A)
Rated fuse Current(A)
upper limit
lower limit
(H)RW11-12/100-6.3
12
100
6.3
0.015
/
5~100
(H)RW11-12F/100-6.3
12
100
6.3
0.015
100
(H)RW11-12/200-12.5
12
200
12.5
0.27
/
125,140,200
(H)RW11-12F/200-12.5
12
200
12.5
0.27
200
About us
About us
Dandong Power Equipment Co.,LTD was established in 1988, which is a professional factory to produce the high-voltage productions in Liaoning province. State Economic and Trade Commission recommended it as the factory provides projects for upgrading urban and rural power grids. It also earned the bidding of electricity in the 2008 Beijing Olympics. Factory has passed the ISO9001 Quality Management System Certification in 1999, and also finished the 2000 concert in 2002.
Factory combines with the feature of the country and town’s power grid. We also design some low tension reactive power compensation. It not only saves power and increases the power supply quality, but also data storage and wireless data transmission and some other functions. It is quite popular in customers.
In January, 2000, Our Company was reorganized as the joint stock cooperative system. After that, we acquired world-class talent, and being the creative factory with the high-quality products. So, we will improve the customers' trust and bring first-class service and products.
We hope we can get a long-term relationship with you in all sincerity.
Packaging & Shipping
Packaging & Shipping
Our Advantage
Our Advantage
Contact us
Contact us
FAQ
FAQ
1. Is your company a manufacturer? A: Our company is a manufacturer which is located in Dandong.
2. Can you offer test report of the product? A: We test every product before packing and delivery test report with corresponding product.
3. Can you offer components of the products? A: Yes, we also sell components separately too.
4. Shall we pay for the sample charges? How to pay and how to deliver us? A: For low cost samples, we providing with FOC, customer need to pay for the freight through Western Union etc or providing with freight collection account of courier like DHL, THT, FedEx, the sample will be sent by courier.
5. May I put my logo and company name on the products? A: Yes, OEM is welcome.
6. Could you manufacture the products according to my drawing or sample? A: Yes, ODM is available, we also could manufacture the products according to customer’s drawing or replicate sample.
7. If new mould is needed, shall we pay for the mould cost? If mould cost will be refunded? A: Yes, customer will be asked to pay for the mould cost, this mould cost will be deducted gradually from your orders.
8. More question A:Feel free to contact me, you will get immediately reply