Golden Future Aluminum corrosion proof flexible arm for dock light

Share on (60614468629):


Price:RUB 2,184.80

Quantity:


Product Overview

Description

Product Description

 Golden Future Aluminum corrosion proof flexible arm for dock light

 

1. Aluminium alloy corrosion proof flexible arm for LED dock light

2. Arm length:1m

3.Cross section Size: 4*4cm

4.Material thickness: 2mm 

5. With Plug socket and switch on the arm to turn on or turn off the light.  Cable go through the arm then connect with the AC power.

6. AC plug on flexible arm is  US, EU and AU spec option.  

7. Socket size: IEC320-C13

flexible arm-3.jpgflexible arm.jpgflexible arm (2).jpg

DL619 dock light.jpg

 

 

 

Packaging & Shipping

 

Packing Details  : 2pc/ctn

Carton size: 25*18*108cm

GW: 8.5kg

 

Our Services

1. OEM and  ODM  accept

2. 1 Year warrenty for any non-artificial damage
3. With Seperate QC department, guaranteed High quality.
 
Company Information

 

GOLDEN FUTURE ENTERPRISE HK LTD. is a specialist on the design and selling of LED industry lighting for more than 10 years, especially for miner lamp, explosion proof lighting fixture, LED street light and other LED commercial lightings, and etc. 

We have more than 10 advanced engineers with many years design experience for the electronic design, structure design and optics design. 

With many years selling, We have good reputation for high quality, good service and punctual delivery time from all our customers all over the world.

 

photo for quality text.jpgphoto for shipment.jpg

FAQ

 

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-7 days if the goods are in stock. or it is 10-15 days for sample, 25-30daysfor bulk order, if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: we offer free sample for our long term cooperated customer, or first cooperation reached to MOQ.

    No need delivery fee.

Q: What is your terms of payment ?

A: IF shipping by sea, 30% in deposite, balance T/T before shipment;

IF shipping by air, 100% T/T before shipment. 

sample payment: 100% in advance by T/T, paypal, West union.

0.2029 s.