58mm 1800mm heat solar pipe vacuum evacuated tube solar collector tubes price

Share on (60663465579):


Price:

Quantity:


Product Overview

Description


58mm 1800mm heat solar pipe vacuum evacuated tube solar collector tubes price

 

Specifications

Three target solar evacuated tube

Three target evacuated tube

Three target coating solar evacuated tube

 

1.High efficiency 
2. 3 targets and blue color 
3.Energy saving 
4.Reliable quality and competitive price

Product Feature

Material: high borosilicate 3.3 glass.

Structure: all-glass double-tube co-axial structure.

Color: blue or purple golden.

Size: 47mm×1500mm, 47mm×1800mm; 58mm×1500mm, 58mm×1800mm, 58mm×2000mm; 70mm×2000mm, 70mm×2100mm.

Thickness: 1.6mm/2.0mm.

Warranty: 15 years.

High absorptance: 93%~96%(AM1.5).

Low emittance: 0.04~0.06(80°C±5°C).

 

 

 

Model

Inner Tube Diameter(mm)

Outer Tube Diameter(mm)

Thickness of Inner Tube(mm)

Thickness of Outer Tube(mm)

Length of Tube(mm)

CDML-01

37

47

1.6

1.6

300~2100

CDML-02

47

58

1.6

1.6/1.8/2

300~2100

CDML-03

58

70

1.6

1.8/2

300~2100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tube structure

All-glass double-tube co-axial structure

Glass material

Borosilicate 3.3glass

Outer tube diameter and glass thickness

Φ =47± 0.7mm & T=1.6mm ± 0.15mm

Φ =58± 0.7mm & T=1.6mm ± 0.15mm

Inter tube diameter and glass thickness

Φ =37± 0.7mm & T=1.6mm ± 0.15mm

Φ =47± 0.7mm & T=1.6mm ± 0.15mm

Tube length

1500mm, 1800mm

 

Coating material

AL-N/SS/Cu

Absorber coating

Sediment method

Three Targets magnetron sputtering plating

 

Absorption

a: ≥92%(AM1.5)

 

Emittance

ε ≤ 3.4% (80° C± 5° C)

Vacuum degree

P ≤ 5.0× 10 -3 Pa

Hail resistance

Φ 25 mm

Pressure-endure

0.8 Mpa

Temperature-endure

250° C

Life

> 15 years

Structure:

20150817_095305_032.jpg

Product Display

QQ20150731164006

Chaoda target tube 01

 750-006

Production Process

CHAODA production process + 750.jpg

Factory Photos

DSC_0692_DSC_0714_

Application

30 tubes solar collector

 DSC_00051.jpg

Packing

Tube Packing Process + 750.jpg

CBM of Tube.jpg

Contact us

Our factory is located in #196-1,LIANHONG ROAD ,YUAN HUA INDUSTRIAL ZONE,HAI NING CITY ,ZHE JIANG PROVINCE,CHINAHaining Chaoda Solar Collector Tubes Co Ltd 750.jpg


0.1917 s.