Share on (60742965863):
Cheaper CZ Purlin Roll Forming Machine Steel Frame and Purlin Making Machines

| 1 | Profile Size | YX 100-300 |
| 2 | Suitable Raw Material | 0.3-0.8mm, Color steel coil, Galvanized coil, Aluminized zinc coil or as your request |
| 3 | Under Frame | 400 H-beam |
| 4 | Sidewall | 20mm |
| 5 | Connect Bar | 25mm, zinc plated |
| 6 | Roller | Gcr15, processed by CNC lathe, hardening and tempering, polishing, hard chrome plated 0.05-0.07mm, with keyway |
| 7 | Shaft | 80mm, solid, finish turning, cylindrical grinding, with keyway |
| 8 | Forming Stations | 15 |
| 9 | PLC | DELTA, TAIWAN |
| 10 | Main Motor | 15kw, Lichao, Shanghai, with reducer |
| 11 | Hydraulic Pump station | 5.5 kw |
| 12 | Cutting blade | Cr12Mov, quenching 58-62°, double oil cylinder |
| 13 | Oil paint | National standard grey |
| 14 | Computer screen | DELTA, TAIWAN |
| 15 | Chain | double 2inch |











Q1. What's your payment terms and delivery time?
A1: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable.
After we get down payment, we will arrange production. About 30-45 days for delivery.
Q2. Do you have after-sales support?
A2: Yes, we are happy to provide advice and we also have skilled technicians available across the world.
Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken?
A4: We provide 18 months free warranty and free technical support for the whole life of any machine.
If the broken parts can't repair, we can send the new parts replace the broken parts freely, but you need pay the express cost by yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the equipment.
Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. we have rich experience in transporting.
Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.
New products from manufacturers at wholesale prices