Metal Sheet Scaffolding Plank Pedal Panel Roll Forming Machine

Share on (60772590171):


Price:RUB 7,581,800.00 - RUB 9,098,160.00

Quantity:


Product Overview

Description

purlin machine corrugated machinefloor deck machine

Metal Sheet Scaffolding Plank Pedal Panel Roll Forming Machine

Scaffold Pedal Panel Roll Forming Machine

Work Flow

3T Manual Uncoiler→Leveling→Servo Feeding→Punching→Forming→Cutting→Output

Technical Parameter

Raw MaterialTypeCold rolled steel strip/Hot galvanized steel strip
Thickness1.5-2.0mm
WidthDepend on profile drawing
Coil IDφ508mm
Roller Quantity18 Stations

Profile Drawing

profile drawing.png

Layout Drawing

layout drawing.png

QQ20180529161333.pngdecoiler.png

Packaging & Shipping

Our Services

 

Installation (optional by the buyer)

a.After the machine arrives at the destination, the seller will send technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs provide some technicians to assist the installation work.

b.Installation period(The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technicians departure): 5 days

c.The buyer pays the installation charges to the seller’s appointed account before the technician departure: USD1,000 per set.

d.Training period: 2 days. (we can supply training on the operation spot if buyer needs)

e.The buyer pays the seller’s technician: Travel cost outside China (including round flight charges), accommodation and foods (at least three-star hotel with air condition), solve the language problem, provide transportation from living place to the work place, and insurance out of China, etc.

f.With in 3 months after arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.

 

Terms of Payment

30% to be paid by TT as Down Payment,70% to be paid by TT before delivery.

 

Time of Shipment

90 daysafter down payment(Including Chinese New Year Holiday for 20 Days)

 

Guarantee of Quality

The Seller shall guarantee the goods with materials and workmanship in accordance with the required on the drawings, brand new, unused and correspond in all respects with the quality, specification and performance as stipulated in drawings and guarantee a good smooth operation for 12 months after date of shipment (except consumables). This guarantee excludes the parts that require the normal plant maintenance. The guarantee is strictly limited to the repairing and the replacing of the mechanical parts supplied by us found to be defective provided that failure has occurred during the ordinary use of the equipment and it is not accepted and claim due to damage to people, property or loss of production.

0.0185 s.