Share on (60808393566):
1.Cost advantage
•No mechanical machining necessary request
•Errors in construction or assembly can be rectified more easily
2. Simple
•Just order and assemble using standardAnodized aluminum profiles for industrial mechanical structural framework profile heavy duty aluminium extrusion and accessories for any structures.
3. Compatibility
•Anodized aluminum profiles for industrial mechanical structural framework profile heavy duty aluminium extrusion can be combined with products in other ranges
| Standard | GB 5237-2008 |
| Product series | Architectural aluminium extrusions and Industrial aluminium extrusions |
| Price | Based on SMM Aluminium Ingot price(www.smm.cn) + Processing Fee |
| Payment term | T/T, L/C at sight |
| Surface treatment | Mill finish,Anodizing, Powder coating, electrophoresis, 3D wood heat transfer,PVDF coating |
| Specification | A. Alloy: 6063, 6063A,6060, 6061, 6005,6082 |
| B. Temper: T5/T6 | |
| C. Length: 3m-6m | |
| D. Normal Anodizing thickness: 10 micro ~20 micro | |
| E. Normal powder coating thickness: 60-100 micro | |
| Packing | With protect film on the profiles surface ,Composite paper,Kraft paper, Shrink film |
| Order process |
| 1. Drawing/colours/price confirmed |
| 2. Die/Mould Making (7 to 10 days) |
| 3. Samples for your comfirmation(1 to 4 days) |
| 4. Mass production,after receive 30% deposit (15 to 20days) |
| 5. Customer check before shipping or SGS checking |
6. Pay the balance and we loaded the container
|





FAQ
Q1: Are you trading company or manufacturer?
A: We are a self-own factory, which specializes in producing Aluminum Alloy profile for windows and doors.
Q2: Where is your factory located? How can I visit there?
A: Our factory is located in Floor 1-4 Middle part of 1st Road, Aluminum Silicon Industrial Park, Xiuwen Town Dongpo Dist, Meishan City Sichuan province, China.
The nearest airport is Chengdu Shuangliu airport. The Meishan East High Speed Rail Station is also near us. Warmly welcome to visit us!
Q3: What's the production time for new molds and mass production?
A: 7-10 days to open the new molds, mass production takes around 20-25days for one 20Tons,25-30days for one 40Tons, can process urgently if need.
Q4.: Can I customize my own products?
A: Yes, we are glad to receive your customize requests, the colors, shapes, capacities and functions; meanwhile the M.O.Q. should be considered.
Q5: How do I place the order?
A: Advisory → Specifications confirm → Inquiry → P.O. confirm →
Deposit → We manufacture → Balance due → Shipment
Q6:What the payment of trems?
A: L/C,T&T is acceptable
New products from manufacturers at wholesale prices