Материал для обслуживания дороги Go Green, заводская цена, высококачественный холодный смешанный асфальт высокого качества для мгновенной дорожной площадки

Share on (62081162767):


Price:

Quantity:


Product Overview

Description


Go Green road maintenance material factory price first class quality cold mix asphalt for instant road pothole patch

 

Product Description

 Go Green Superior Cold Mix Asphalt is a Superior Permanent Road maintenance material, uses a high performance polymer formulated to guarantee its good workability, applicable in all weather conditions and can works in water, repair both asphalt and concrete driveway, no tools needed, accept traffic immediately after installation.

 

Application Range

 

Go Green cold mix asphalt is best choice to repair potholes, utility cuts, road edges, water main breaks, also be utilized as permanent asphalt patch, trench reinstatements, man hole adjustments.

 

Go Green cold mix asphalt can repair both concrete and asphalt road easily.

 

^BC481F9068EF59775717C30DB6C70C7032F8E0B0E89351A660^pimgpsh_fullsize_distr.jpg

 

Outstanding Features:

 

1. All weather to use

2. Applicable for rainy and snowy

3. Used in concrete or bituminous pavements

4. No need tar coating material

5. Permanent repair, no need to maintenance at least 10 years 

6. Construction is simple, open to traffic soon

7. Working temperature is -25℃ to 50℃

8. Shelf life unopen 2 years

9. 100% eco-friendly, cold mixing

 

Packages are available in 20kg bag, 20kg bucket and 1 ton bag

 

1 (2).png

 

 

Construction

  

-01_.jpg

 

Step 1 Clear

 

Sweep the base of the pothole of any loose debris by sweeping or raking. Ensure that no large loose rocks are present in the pothole before pothole repair step 2.

 

Step 2 Pour

 

Fill the pothole with Go Green cold mix asphalt. Recommended compacted depth is 50mm. If area is deeper than 50mm, compact in layers (no deeper than 50mm per layer).

 

Step 3 Tamp

 

When hole is filled, apply a small crown to repair area to allow for additional compaction. Now tamp, or wheel roll for the final time , and you may now open to traffic – immediately!! It’s that simple. 

 

Related Products
HTB1CJhvPa6qK1RjSZFmq6x0PFXaf.jpg411.jpg

Hot product.jpg

Packaging & Shipping

package&shipment.jpg

pack4.jpg 

Company Information

Our company.jpg

Certifications

 certification_.jpg

FAQ
 Questions You May Care About:

 

Q:How much Go Green® cold asphalt do I need to repair the pavement?

A: Enter the dimensions in our easy to use calculator to determine the amount.

 

Q:Should I cover the patched area while it cures?

A: Absolutely not. Go Green® cold asphalt is ready for traffic immediately following compaction.
Covering the patch delays the curing process, and provides no benefit to your repair.

Q:Can I use Go Green Cold Mix Asphalt in rainy and snowy weather?

A: Yes, Go Green superior cold mix asphalt is a kind of water-proof material, all weather to use, you can use it in rainy and snowy days, even if the pothole is filled with water, no need to clean the water, directly repair the pothole.

 

Q: What if 1 bag didn’t use up one time?

A:Just reseal the bag, use it in next time, it won’t affect its quality or workability.

Contact us

Anna Wang

Senior Export Manager

 

GO GREEN INDUSTRIAL (SHANGHAI) CO.,LTD

Tel +(86) 21 61053027 Mob: +(86) 15000367869 Wechat/Whatsapp: +(86) 15000367869 Website:www.go-green.com.cn

clip(03-29-12-04-59).jpg


0.2011 s.