Abattoir offal waste treatment plant

Share on (62092896137):


Price:

Quantity:


Product Overview

Description


Product Description
TEENWIN abattoir offal waste treatment process chart:

.png

 

.png.png.png6.png
9.png.png
 
 
TEENWIN abattoir offal waste treatment plant includes:
 
  1.Organic waste pretreatment equipment 
  2.Inlet,outlet feeding pump
  3.Anaerobic reactor
  4.Biogas purification,storage,biogas pump equipment 
  5.Biogas application equipment 
  6.Solar heating and heat exchange equipment 
  7.Related piping (feeding pipes, biogas pipes, water pipes, etc.) 
  8.Control panel
 
 
The technical parameter of TEENWIN biogas plant:
 
  
SNItemTY-BP-50TY-BP-100
1Overall volume(m3) 50 100
2Size(m)Ø6.0*2.5 Ø8.0*3.0
3Max.Biogas output(m3)80 160
4Electricity output(kwh) 120 240
5Area required(m2) 40 70
6

Single maximum input of various organic waste

(kg/day)

Animal offal1350 2700
7Fruit  or vegetable waste1600 3200
8Pig manure1750  3500
9Cow dung1880  3760
10Chicken manure 1600 3200

 

 

Why choose TEENWIN's Biogas plant:

 

 1.  Easy and quick installation: the plant is integrated device; it can be quickly put into use after installation

 2.  High efficient and Low energy consumption: it can be adjusted the optimum fermentation temperature     according the different  raw materials, and constant reacting temperature keeping, automatic PH   adjustment and automatic mixing, biogas can be collect   and transport to storage not need consume energy.

 3.  Environmental friendly: no odor and waste discharge, the gas produced is collected use for energy; the   residue due to full fermentation has no smell, it is top bio-fertilizer, can be used for crop.

 4.  Faster gas production due to much higher and constant temperature, mixer in the reactor.

 

Contact message:

 

Tel: +86-15302648117

Whatsapp:  +86-15302648117

Skype:  Owenzhujie

QQ: 794144055

Wechat: Owenzhu2

Facebook: Owen Chu

 

 

Packaging & Shipping

 

Lead time: 10-25 working days for sample

Charge:The buyer pays the sample cost and freight.

Order Production :

Lead time: 10-35 working days after receipt of deposit.

 

 

Our Services

 

Service and Advantage:

♦ Sales service time:24 hours for one day, 6 days for one week to supply completely service for you any time.

♦ Warranty time:12 months.


Delivery Service :

♦ Export standard , safety and environmental packing Quick lead time for mass production.

♦ Accept EXW, FOB, CIF and other price terms.

 

Payment Terms:

♦ T/T, Western Union, L/C, Money Gram.


Technical Service:
♦ Professional Engineering supplies technical supporting.

♦ Support OEM, ODM project.


Quality service:

♦ 100% quality testing for every finished products before delivery;

 

 

Company Information

 _.png


0.2111 s.