Mertop N55 CATLESS DOWNPIPE FIT FOR M135i(x) F20 / F21/335i(x) F30 / F31 / F34 /435i(x) F32 / F33 2006/2013

Share on (62274754165):


Price:

Quantity:


Product Overview

Description


Mertop N55 CATLESS DOWNPIPE FIT FOR M135i(x) F20 / F21/335i(x) F30 / F31 / F34 /435i(x) F32 / F33 2006/2013

1.jpg

 

Application:

M135i F20 / F21 till 06/2013
335i(x) F30 / F31 / F34 till 06/2013
435i(x) F32 / F33 till 06/2013
5.jpg8.jpg11.jpg
 

Features:

  • made out of high quality stainless steel 1.4301 (SS304)
  • 100% perfect fit, replace OEM
  • less thermal load on the turbocharger
  • more power by reducing back pressure
  • significantly more torque
  • catless*
 4.jpg

 

Package Included:

 
DownpipeX1pc
Inner box:           40*19*19cm     2.14kg 1set into a inner box
Our carton box:  43*39*40cm     9.54kg  4sets into a carton box

 

More products,please click the below pictures:

01.jpg1.jpg1.jpg

MERTOP exhaust pipe fit for N55 335I 2013+/ F30 F20/ F22 M235i M235xi 2013+/f87 M2 2015+200cell Downpipe

 

MERTOP 3.0'' Golf MK6 R 2.0 TFSI A3 8P 1.8 TFSi Downpipe catless Stainless Steel De-cat Exhaust pipe

 

Mertop Race M30 T3T4 Top Mount Manifold fit for E30/E32/E34/E28/E24/E23/E9

 

 

Company

MERTOP RACING , owning one subsidiaries of Hangzhou Auto Auparts.Co.Ltd  specializing the design and manufacture of exhaust systems for aftermarket and modified market applications. The company is equipped with 14 bending machines, 3 of which are CNC servo motor tube bending machines that are capable of bending stainless steel tubes with diameters up to 5.5 inches, and possesses laser cutters, water jet cutters, cyber-welders, CNC production centers, CNC grinders, millers and other hydraulic machines, with an annual production capacity of approximately 120,000 sets.

.jpg 

Team

QQ20190724141528.jpg

Mertop Racing vision
To be the leader of exhaust modification industry and the creator of industry standards


Mertop Racing mission
To provide customers with quality products and services,create a better life for employees,and create value for the society


Mertop Racing tenet
Quality for survival,reputation for development,quality first,reputation first,honesty oriented,win-win cooperation, pragmatic innovation,sustainable development

Workshop

.jpg         2.jpg

 

1.jpg         3.jpg

 

Certification

.jpg 

FAQ

Q1:How to proceed an order for your products?

We are a direct production factory, we will directly quote the existing products, provide carton size, weight, etc. If it is a customized product, we will quote according to customer requirements, survey data and make drawings, make molds, arrange sample production, after confirmation Mass production of products and testing of products.

 

Q2:How about your delivery time?

In general, stocked products are shipped in 15 days, custom products take 30 to 45 days. The exact delivery time depends on the number of orders and customer requirements.

 

Q3:What about the sample MOQ?

Samples are available, but customers must pay for the sample and shipping costs.

 

Q4:About packaging?

1. Usually use a thick neutral carton
2. Double-layer cover carton, the packaging cost is slightly higher,
3. Using foam packaging, high packaging cost and good firmness.

 

Q5:About service?

We provide good quality and competitive prices to ensure both sides benefit.

 

Q6: About customize?

Customize is available,both product and logo,but customers must order more than 10 sets.


0.2144 s.