Share on (62522398320):
100-1500 t/d Capacity Placer Gold Leaching Process Equipment CIL Mining Machine Alluvial CIP Gold Processing Plant for Sale
Metal recovery or concentration by adsorption on activated carbon has been the dominant process for gold extraction after leaching by cyanide in aerated alkaline slurry. The continuous processes of gold recovery by adsorption on activated carbon in agitated tanks, namely the carbon-in-pulp (CIP) and the carbon-in-leach (CIL)processes, have been widely used since the 1970s.


Carbon-in-pulp (CIP) is the sequential leach then absorption of gold from ore. During the CIP stage, pulp flows through several agitated tanks where sodium cyanide and oxygen have been added to dissolve gold into solution. In the absorption stage, this solution flows through several agitated tanks containing activated carbon. Gold absorbs on to the activated carbon, which flows counter-current to the pulp, while screens separate the barren pulp from the gold-loaded carbon.

In the CIL (Carbon in Leach) or CIP (Carbon in Pulp) plants while the precious metals are being dissolved by the cyanide solution in the large volume tanks the dissolved metals are adsorbed by the active carbon. These processes are generally preferred for the relatively high grade and lower reserve ore types with very fine graded precious metals.
The major difference between the CIL and CIP processes is; during the CIL process both cyanide leaching and carbon adsorption take place in the same tanks but in the CIP process first leaching occurs in the first couple of tanks then carbon adsorption take place in the following tanks while leaching continues. In all of these tanks agitation and air sparging is available.






Model | Tank Spec. Diameter × Height (mm). | Effective Volume (m3) | Impeller Rotation Speed (r.p.m) | Impeller Diameter (mm) | Power (kW) | Tank Weight (kg) | Total Weight (kg) |
LT2.0×2.5 | 2000×2500 | 6 | 52 | 909 | 2.2 | 1609 | 2190 |
LT2.5×3.15 | 2500×3150 | 13.14 | 935 | 2450 | 3180 | ||
LT3.0×3.15 | 3000×3150 | 18.93 | 43 | 1130 | 4 | 3530 | 4260 |
LT3.0×3.5 | 3000×3500 | 21 | 3298 | 4400 | |||
LT3.15×3.55 | 3150×3550 | 24 | 1260 | 3510 | 4560 | ||
LT3.5×3.5 | 3500×3500 | 30 | 52 | 1310 | 5.5 | 3560 | 5110 |
LT3.55×4.0 | 3550×4000 | 33.6 | 43 | 4320 | 5100 |
1.How is the quality of your products?(mining equipment/machine)
Answer: Our products are manufactured strictly according to national and international standard, and we will take a test on every grinder before delivery.
2.Guaranteed:
Answer: All of our products are guaranteed for one year. If products quality is not consistent with the description as we described or the promise before you place order, we promise 100% refund.
3.How about price?
Answer: For the complete same machine, we can promise our quality is the best when the price same as other competitors, and our price can be lowest when the quality at standard level.
4.Service and Payment Terms?
Answer: We can accept T/T and L/C; 30% deposit, 70% balance before delivery, which is international trade practice; Finished product pictures will provide to customers before delivery.
Pre-sales service: 7*24 hours online consulting service, we provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.

Sales service: Send technicians to the jobsite guiding the installation and adjustment, training operators and finishing the check and accept together with you.

After-sales service: To establish long term friendship, we will reg-ularly pay return visit to customers. Supplying technique, building design, instruction, installation and debugging for free.

If you are interested in our products, please don't hesitate to contact us. You can tell me the following questions, so that we can send you accurate quotation soon, including extra discounts!
1. Which machine do you need? like gold washing machine, spiral chute, vibrating screen, Jig separator, Shaking table, stone crusher, jaw crusher, impact crusher etc.
2. What is your raw material plan to process? like gold ore, diamond ore, tantalite ore or iron ore, etc.
3. The capacity you need? Like 100 tons per hour or 2000 tons per day.
4. Your contact information? Both Email and phone number are essential, we can contact you easier.
100% response rate
100% response rate
100% response rate
100% response rate
100% response rate
100% response rate
100% response rate
100% response rate
100% response rate
New products from manufacturers at wholesale prices