Share on (853113596):
Application Areas
JZG20A Deadline Anchor is a mechanism that converts deadline pull of a drilling rig into liquid pressure. It is one of the important components of weight indicating system, which can be used with JZG18.1.5 sensor made by the company to work as the primary instrument, and then makes a weight indicating system together with weight indicator and recorder.
Technical Specifications
1. Maximum deadline pull: 200kN
2. Sensator: JZG18.1.5
3. Error of output pressure f deadline anchor: ±1%
4. Size: 1060mm×762mm×365mm
5. Weight: 550kg
6. Slickline diameter: Φ29mm,Φ26mm
| Type | Anchor Type | Form of Primary Instrument | Max.Deadline load(kN) | Number of Lines | Load(kN) |
| JZ900 | JZG72 | Horizontal | 720 | 14 | 10080 |
| 12 | 8640 | ||||
| JZ700 | JZG60 | Vertical | 600 | 14 | 8400 |
| 12 | 7200 | ||||
| JZ500 | JZG42 | Vertical | 420 | 12 | 5040 |
| 10 | 4200 | ||||
| JZ500A | JZG41 | Horizontal | 410 | 12 | 4920 |
| 10 | 4100 | ||||
| JZ400 | JZG35 | Vertical | 350 | 12 | 4200 |
| 10 | 3500 | ||||
| 8 | 2800 | ||||
| JZ400B | JZG34A | Horizontal | 340 | 12 | 4080 |
| 10 | 3400 | ||||
| JZ250 | JZG24 | Vertical | 240 | 12 | 2880 |
| 10 | 2400 | ||||
| 8 | 1920 | ||||
| JZ200 | JZG20 | Horizontal | 200 | 10 | 2000 |
| 8 | 1600 | ||||
| 6 | 1200 | ||||
| JZ150A | JZG18A | Vertical | 180 | 10 | 1800 |
| 8 | 1440 | ||||
| 6 | 1080 | ||||
| JZ150 | JZG18 | Horizontal | 180 | 10* | 1800 |
| 8 | 1440 | ||||
| 6 | 1080 | ||||
| JZ100 | JZG15 | Horizontal | 150 | 10 | 1500 |
| 8 | 1200 | ||||
| 6 | 900 | ||||
| JZ60 | JZG10 | Straight pull | 100 | 8 | 800 |
| 6 | 600 | ||||
| 4 | 400 | ||||
| JZ40 | JZG10A | Horizontal | 100 | 6 | 600 |
| 4 | 400 |

Rugao You Inport & Export Co. LTD was established in 2004, which was among the earliest trading companies strongly supported by Ministry of Foreign Trade and Economic Cooperation.
Through the past ten years, our company has already established a deep strategic cooperation relation with domestic suppliers who specilizes in oil drilling equipments, and become the top level supplier of some well known large or medium sized SOEs such as CNPC and Sinopec. The products made by our company are exported to Europe, America, the Middle East, North Africa and Southeast Asia and other regions, because of which, we enjoy widespread praise among customers at home and abroad. Our mainly products: drilling rig parts, drilling equipment, solid control system, wellhead equipment, fishing tools, cementing tools. All the productions is within the standard of API and authorized by ISO9001:2000

According to the volume and weight of the product and export requirements, provide multi-layer boxes and iron box packaging.
Transportation is based on customers in different regions using steam, rail, road and air transportation.

Q1. How to get an accurate quotation?
A1: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output,
Q2. What if I use this machine for the first time and know nothing of it ?
A2: We will have our engineers teach you how to operate it,you can just inform us some details of the product you need then we can customize as your special order.
Q3. How does your factory do regarding quality control?
A3: We has been regard quality as the priority. We always attach great importance to quality controlling from the very beginning to the very end ,so our press can match all the CE and ISO standard also more strict standard .
Q4. How about your delivery time?
A4: Generally, it will take 35 working days after receiving your deposit payment. The specific delivery time depends on the items and the quantity of your order. Sometimes we have standard machines in stock.
Q5. What is the warrantee period of the machine?
A5: We can supply 1 year warranty for our machines, We can send engineer to customer place if big quality problem. We can provide internet or calling service at any time.
Q6. after-sales service
A6: 1. Installation:Free installation and commissioning, travel expense is on foreign customer.(Including round ticket and
accommodation cost)
2. Personnel training: Our engineers will give your employees free machine training when they come to your company to assemble the machines, and welcome to our factory to learn how to operate our machineQ1. How to get an accurate quotation?
A1: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output,
Q2. What if I use this machine for the first time and know nothing of it ?
A2: We will have our engineers teach you how to operate it,you can just inform us some details of the product you need then we can customize as your special order.
Q3. How does your factory do regarding quality control?
A3: We has been regard quality as the priority. We always attach great importance to quality controlling from the very beginning to the very end ,so our press can match all the CE and ISO standard also more strict standard .
Q4. How about your delivery time?
A4: Generally, it will take 35 working days after receiving your deposit payment. The specific delivery time depends on the items and the quantity of your order. Sometimes we have standard machines in stock.
....
New products from manufacturers at wholesale prices