New PU Epoxy Resin Concrete Crack Injection Grouting Machine Price

Share on (895265301):


Price:

Quantity:


Product Overview

Description


New PU Epoxy Resin Concrete Crack Injection Grouting Machine  


800


Introduction
The machine is for crack repair. It delivery the polyurethane grouting material to the center in high pressures, the material diffuse from center to all direction. The materials fast react with water and harden to plug up the crack permanently and stop the water leaking.


Compared to the traditional product, this machine save time and material, because it is using hose suction method to feed-in material.  This high pressure injection machine can stop the water immediately, especially for stop the big running water, it's very fast and efficient.


 


 


Feature


1. Good mechanical performance, no noise, no pollution


2. Small volume, light weight, easy to carry, simple operation


3. In a few seconds to ascend to a working pressure of 5000PSI, perfusion time than other models quickly.


4. Repair is simple, does not need special training to repair


5. Durability, maximum pressure of 10000psi body parts can not be deformed.


6. With the material, PU foam sealing agent, epoxy resin, polyurethane, acrylic resin (generally use PU foam sealing agent).


 


Specification














































Model



 JBY-800



Usage



Grouting 



Power 



910W/220V



Weight 



8 kg



Max output pressure



13500pis



Restart pressure



7500pis



Safe range of high pressure hose



less than 13500psi



Safe range of switch valve



less than 10000psi



Applicable materials



PU foam agent, Epoxy resin. Polyurethane, acrylic resin



Package



50*19*31cm



 


 


Accessories freely 


1 set Drill 910W


1 pc 5M high pressure hose


1 pc shut-off value


1 set Sleal set


1 set  T type wrench


1 pc Zerk


1 pc  Filter


1 set  Material cup


10 pc  Rubber pad


800- 


 


 


 


Usage Range 


 


1109225993_927505941109238007_92750594



  • A variety of buildings and underground concrete cracks, expansion joints, construction joints, structural joints sealed plugging.

  • Geological drilling engineering drilling wall plugging reinforcement.

  • Water conservancy and Hydropower Project reservoir dam grouting, plugging cracks in the tunnel water, waterproof, impervious dam reinforced concrete cracks.

  • High rise buildings and railroad, Highway Roadbed Stabilization.

  • Coal mining and other mining engineering of tunnel water plugging, roof breaking layer reinforcement.

  • Bridge foundation reinforcement and the bridge body crack of reinforcement.

  • Deformed Reinforcement of buildings, concrete structures such as the Water Tower, pool crevice reinforcement etc.


 


Attention


Please wear protective supplies ( such as gloves, masks, goggles ) when perfusion to avoid touching the materils with the skin. If contamination of slurry please rinse with water. Or touching the glasses product rinse with plenty of water firstly after the hospital .


DSC_1562A


 


Contact person: kindy 


Tel : +86-18680531938


wechat: A18680531938


0.2085 s.