Go Green Color Asphalt Ready to Pave Cold Mix Color Asphalt Materials

Share on (956504817):


Price:$9.20 - $9.35

Quantity:


Product Overview

Description


Go Green Color Asphalt Ready to Pave Cold Mix Color Asphalt Materials


 


Product Description.png


 


Go Green Cold Mix Colored asphalt is a new patented high technology product, uses eco-friendly cold mix processing and significant ultra thin overlay technology, the material can be storaged and shelf life unopen up to six months. Its suitable for landscaping paving, sport and leisure, public parks and gardens, bus lane, bicycle path as well as light traffic driveway paving. The paving thickness is only 1.0-1.5cm, which greatly reduce the material cost. 


 


Different color avaiable


 


20140214163411_6226.png20140214163423_1692.png


 


Outstanding Features



Go Green Micro-Paving Cold Mix Color Asphalt has some basic performances such as soft, easy to compact, water stability, long shelf time, excellent strength, construction at normal temperature, they are generally described as follows:


 


A. Cold mix technology. Paving thickness only 1.0-1.5cm.


B. Noise reduction, Anti-slip and Fog-proof.


C. Stick to the original pavement surface closely


D. Storage up to 6 month


E. Excellent resistance to water damage.


F. Environmental Protection


G. Construction time no limitation.


H Different color available, lively colors protection 


 


Application Area


QQ20151202111258_.png


 


Package are available in 20kg bag and 1 ton bag


 


How to Use.png


Step one:


 


Preparation


 


1.   The product construction temperate should be above 0°C, recommend to construct above 5 °C


 


2.   Clean the Debris of the road. The surface should be free of ice, standing water, snow, and loose material.


 


Step two:


 


Paving 1.0-1.5cm thickness by standard asphalt paver.


  


Step Three:


 


Compact the surface as soon as possible, after  1-2 hours, compact 4-5 times to guarantee the compaction without crashing aggregate.


 


Step Four:  


 


Close traffic completely after construction. till pavement surface is dry and hard, depends on the weather, usually open to traffic after 6-12 hours. 


QQ20151202114023.png


 


Our Company.png


 


^2794C7954CAC14D2353EA517F03A4E5FAC8386A6533058EDD9^pimgpsh_fullsize_distr.jpg


 


Certification


 


-01.jpg
^5FB8C6F47C06228B88A0B4EAD5C7AA255962C4E42FA699F116^pimgpsh_fullsize_distr.jpg


 


Our Market


 


-1.jpg 


 


Welcome to contact us, or call us 021-61053027, we will reply to any of your question at the earliest time.



 



0.2144 s.