Мощное бурение обсадных труб с симметричной системой вскрышных работ

Сохранить в закладки 1601041731371:


Цена:8 751,48 ₽*

Количество:

  • В избранное

Описание и отзывы

Характеристики





Product Description


Casing Drilling Concentric is a product that finds extensive applications in the drilling industry. The primary use of this technology is in the construction of boreholes, where it facilitates the insertion of casings into the ground while also enabling drilling operations to be carried out simultaneously. The concentric design of the casing and drill pipe allows for efficient drilling through various types of soil, rock formations, and other geological materials.

One of the significant advantages of Casing Drilling Concentric is its ability to reduce the time required for drilling operations. Since the casing and drilling pipe are combined into a single unit, it eliminates the need to remove the drill pipe to insert the casing, thus saving valuable time during the drilling process. Additionally, this technology enhances the stability of the borehole by reducing the risk of collapse or deviation, ensuring safer and more efficient drilling operations.

Another distinctive feature of Casing Drilling Concentric is its adaptability to various drilling conditions, such as unconsolidated formations, fractured rock, and high-angle wells. Its design enables it to traverse diverse terrains, ensuring reliable casing placement and improving drilling efficiency. This technology also minimizes the environmental impact of drilling activities, making it a preferred choice for projects that require environmentally friendly techniques.

Overall, the Casing Drilling Concentric technology provides an innovative solution that improves the speed, safety, and efficiency of drilling operations while reducing costs and minimizing environmental risks.

Here's a general overview of how an overburden casing system works:





1.Concentric system drilling throudh overburden
2.Reverse rotation of the hammer and pull out the pilot bit
3.Replace the pilto bit to normal bit to continue drilling
4.Finish Casing drilling work


Pilot bit
RIng bit Set


Product Paramenters


Model
O.D.of Casing Tube
( mm )
l.D.of the Casing  Tube(mm)
Wall Thickness of the Casing
Tube(
mm)
Max.O.D.of Guide Device(mm)
Ring bit OD(mm)
Match DTH hammer
P108
108
94
7
92
118
COP34/DHD3.5
P114
114
101
6..5
82
128
COP44/DHD340/QLX40
P127
127
108
9.5
86
138
COP34/DHD3.5
P146
146
126
10
124
156
COP44/DHD340/QLX40/SD4
P168
168
148
10
125
184
COP54/DHD350/QL50/SD5
P178
178
158
10
140
192
COP54/DHD350/QL50/SD5
P194
194
174
10
148
206
COP64/DHD360/QL60/SD6/M60
P219
219
198
10.5
170
234
COP64/DHD360/QL60/SD6/M60
P245
245
219.6
12.7
186
260
COP84/DHD380/QL80/SD8/M80
P273
273
247.6
12.7
203
298
COP84/DHD380/QL80/SD8/M80
P325
325
299.6
12.7
255
350
DHD380/QL80/SD8/M80/N100
P406
406
380.6
12.7
340
438
DHD112/SD12/N120/QL120
P508
508
482.6
12.7
445
538
SD18/TK18/N180
P610
610
581.6
14.2
514
630
SD18/TK18/N180/QL200
P660
660
631.6
14.2
590
680
SD18/TK18/N180/QL200
P711
711
682.6
14.2
606
731
SD18/TK18/N180/QL200
P762
762
730
16
669
782
TK24/NUMA240
P813
813
781
16
709
835
TK24/NUMA240
P914
914
882
16
818
935
TK28
P1016
1016
984
16
913
1040
TK28/QL300
P1220
1220
1180
20
1136
1250
TK28/QL300
Other specifications are available upon request.


Applications


Water well drilling
Eccentric casing system(ODEX) is the main drilling tools in water well projects,which can keep drilling the hole and protecting it from caving in the same time.And it can significantly reduce the drilling time when drilling through the overburden.
Anchoring
Eccentric casing system(ODEX) can meet the requirements of anchoring projects better when reinforcing the slope.
Micro piling
In soil,clay and sand rock formations.eccentric casing system is the most economic and fastest in protecting the hole from
collapsing with permanent or temporary casing tubes.




Other Casing Tools


Overburden casing system 
Overburden casing system commonly denotes a methodology employed in specific drilling operations, such as water well drilling,anchoring, micro piling, or geothermal engineering. This technique involves the installation of a casing or pipe through successive layers of soil, rock, or other materials that lie above the target zone. The primary purpose of this casing system is to provide essential support and ensure stability throughout the drilling process. By penetrating and securing the overlying layers, it prevents cave-ins, collapses, or other undesirable occurrences, thus facilitating safer and more efficient drilling operations. This method plays a crucial role in maintaining the integrity of the borehole, protecting it from potential structural damage, and allowing for the extraction of desired resources or the implementation of various engineering applications.


Concentric casing system with ring bits
It is suitable for overburden with complex geological conditions, such as pebble, fissure, dry stone, boulder, construction backfield waste, etc. It can be drilled at any angle with high straightness.
The maximum diameter of the hole can reach 1550 mm.


Concentric casing system with blocks
1.The material of joint tools is better than casing tube and after heat treatment, the connection is reliable.
2.The casing shoe is heat-treated to extend the service life.
3.The blocks and locking kit are strengthened and have good comprehensive performance
4.Application fields: pile foundation engineering, slope support engineering


Concentric casing system with wings
It is suitable for covering layers with loose materials, such as soil, clay, weathered rock, and sand particles.


Our Company








Our Certifications




Packing & Delivery


Packing Details  : Wooden cases

Delivery Details : 15-18days after get the deposit



FAQ


Q: Are you trading company or manufacturer ?

A: We are factory.



Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.



Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.



Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:





Похожие товары

Новые поступления

Новинки товаров от производителей по оптовым ценам