Сохранить в закладки 60372897587:
Taizhou Huangyan Chenhang Mould Factoryis a professional company engaged in mould design, manufacturing & producing, we are specialized in commodity mould (such as bucket, chair, turnover box and desk) and other injection mould. Our factory is located in Taizhou Huangyan where is a beautiful and nationally renowned "Mould town of China"
** We can tailor various kinds of moulds according to customers’ requests. And our quotation can be made both based on drawings and customers’ products details. We also accept sample order. We are manufacturer, so our moulds are both excellent in quality and reasonable in price.
** Most of our moulds exported to Russia, Israel, India, Egypt, Arab, Brazil, Mexico, Philippines and other Europe & America countries.
Mold Name | 2021 Hot sale plastic cheese food container mold |
Mould Shaping | injection mold |
De-mould Type | Automatic Eject (Ejector pin, Air gate, Ejector plate, Hydro-cylinder, etc) |
Mould material | 2738, H13, P20, 40Cr, 5CrNiMo, 718H, NAK80, 2316, 45# |
Mould base | C45, S50C, 45#, S55C |
Mould Cavity | Single or multi |
Sprue Gate | Hot runner, Cold runner, Pin-point gate, Submarine gate, etc |
Design software | UG, CAD, PROE, SOLIDWORKS,CAXA, etc. |
Plastic material | PP, PC, PS, PE, PU, PVC, ABS, RUBBER,SILICON, etc |
Mould life | 300,000-3,000,000 shots |
Delivery time | 15-60 days |
Payment Terms: | T/T or L/C |
Packaging | Wooden Cases |
Transportation | By Sea or by air |
Export Country | worldwide |
Specification | Depends on customer's requirements. |
OEM order | welcome |
Packaging details:
Step 1, the mould covered with anti-corrosive oil inside.
Step 2, mould outside paint with anti-rust oil and plastic film outside.
Or painting some special colors like blue color, yellow color, etc, and plastic film outside.
Step 3, final packed into wooden case.
1.Mould Material Q/C
a) mould steel checking (hardness,flaw detection)
b) mould spare parts checking (hardness,size)
2.Mould Making Process Q/C
a) design checking ( part design,mould desig,mould enginering drawing)
b) mould size checking (according to drawing)
c) mould testing (check mould working,sample)
Chenhang Mould Operating Steps
1.Unscrew the bolt to take down the Connection Block.
2.The cooling channel connected by Diffluent Block.
Attention pls:
Pease offer the following information when you send us the mould inquiry for 2015 Hot sale plastic cheese container mold
a) product drawing or the sample photo with sizes.
b) mould steel you want to use.
c) standard mould base or not.
d) runner system you want(cold or hot)
Contact Us
Our location on map
The time take from other city
1.From Ningbo by train 1 hour.
2.From Yiwu by bus 3 hours.
3.From Shanghai by train 4 hours.
4.From Guangzhou by air 2 hours.
Please feel free to contact with us for 2018 Hot sale plastic cheese container mold . Thank you !
Новинки товаров от производителей по оптовым ценам