Share on (1600379015282):
Standing seam Roll Forming Machine
Product Descriptions
The products produced by Satnding seamRoll Forming Machine , it is used in various industrial plants, warehouses and other roofing productions with the advantages of high peak height and high strength. The lap joint installation is safe and reliable, and the waterproof and anti-riot violent performance is strong. The pressure plate produced by the machine solves the conventional series. Leakage of the roof panel of the profiled panel.
Version to design

Working Flow
Decoiler -- Guiding device --Forming system -- Cutting device-- Output table

Product Parameters
Items | Specifications | |
Material of coil | Material | Color steel |
| Material Width | As per sketch |
| Material Thickness | 0.8-1.2mm |
| Manual Uncoiler | 5 tons |
Forming system | Rolling Speed | 10-15m/min |
| Roller Stations | 13Stations |
| Roller Material | 45#steel |
| Shaft Material | 45#steel |
| Shaft DIA | D56mm |
| Main Motor Power | 5.5kw |
| Side Plate | Wall plate |
Cutting system | Hydraulic cutting Power | 3kw |
| Material of blade | Cr12Mov |
| Tolerance | +1.5mm |
Electrical control system
| Electric Source | 380V, 50HZ,3 phase (Customized) |
| PLC Control System | Panasonic |
| Way of Drive | By chain |
Main Components
No. | Name | Qty |
1 | Decoiler | 1 |
2 | Main roll forming machine | 1 |
3 | PLC Control box | 1 |
4 | Hydraulic station | 1 |
5 | Output table | 2 |
Pictures

1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.
2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time
5.What are your terms of payment ?
First payment: 30 % by T/T, second payment: 70% by T/T, after the successful inspection at seller’s workshop, and before delivery.
New products from manufacturers at wholesale prices