The track link pin press is a special tool by utilizing the conversion from hydraulic energy into mechanical energy to dis-assembly the track pin of a crawler excavator.
Manual, electrical or manual and electrical pump is used as a power source to move the hydraulic jack forward so that the pin can be removed smoothly. Instead of gas cutting and hammering, it ensures that the track is intact.
It is an ideal special tool for track excavator maintenance and assembly.
Hydraulic system of electrically driven track press: hydraulic system (pump station) is installed on the right side of the host. The entire hydraulic control system drives the high-pressure pump to input the pressure oil through the motor.
After the solenoid reversing valve, the oil is respectively input to enable the cylinder plunger to reciprocate up and down. In the neutral position,the system is unloaded and the oil flow goes into the tank.
The press is electro-hydraulic controlled. Extra hand pump can be equipped for field operation without power supply.
Packing & Delivery
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
Company Profile
FAQ
1. You are a trader or a manufacture? We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric, and our sales department is in City centre of Xiamen. The distance is 80Kms, 1.5 hours. 2. How can I be sure the part will fit my excavator? Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing. 3. How about the payment terms? We usually accept T/T or L/C. other terms also could be negotiated. 4. What is your minimum order? It depends on what you are buying. Normally, our minimum order is USD5000. one 20’ full container and LCL container (less than a container load) can be acceptable. 5. What is your delivery time? FOB Xiamen or any Chinese port : 35-45 days . If there are any parts in stock , our delivery time is only 7-10 days. 6. What about Quality Control? We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.
Contact us. Contact us if you would like any further details or information on any of High quality machinery spare parts , and we will be more than happy to answer any questions that you may have.