polyurethane polymer acrylic spray sublimation waterproof coating

Share on (60244210037):


Price:

Quantity:


Product Overview

Description


E- 929 low price high quality single-component polyurethane waterproof roof coating

single component PU waterproofing coating  hot customize waterproof polyurethane coating   polyurethane waterproof paint

waterproof material

 

929

 

 

Product Introduction

 

E- 929 can be applied on wet surface and complicated projects with its unique mechanism of reaction by atmospheric moisture and the NCO end group of the PUP to form a seamless, strong bonding, elastic and flexible waterproof film.

 

 

 

Performance Index
ItemIndex
Tensile strength Mpa ≥1.92.45
Elongation at break ≥550450
Bending resistance at low temperature °C ≤   -40°C no gash
Imperviousness 0.3Mpa, 30 minImpermeable
Solids content % ≥80
Surface drying time h≤  12
Hard drying time h≤  24

 

 

 

 

Product Features

 

  • One-component packaging, ready to use, avoid unstable condition when mixing
  • Anti-aging, acid & alkali resistance, high & low temperature resistance performance
  • Environment friendly: conform to the harmful substances standard GB 50325-2001
  • Apply combine with high polymer membrane, self-adhesive polymer modified-bitumen waterproof membrane.
  • High bonding strength, high adhesion, excellent performance 

 

 

 

Applicable Scope

 

  • Non-exposed roof
  • Underground projects
  • Kitchen & bath
  • Non-drinking water project
929 application.jpg
 

Application procedures

 

Preparation Substrate treatment  Detail parts treatment  Apply the bottom layer as treatment  Scrape the coating  acceptance Cover the protective layer

 

 

 

Main points of application

 

 

 

  • The surface should be clean and firm, repair flaw part beforehand.
  • Detail parts treatment: Coat a layer on the internal and external corners and the part of pipeline bottom, and then apply reinforce layer (non-alkali fiberglass fabric or non-woven fabric), make sure that the coating saturate completely the reinforce layer.
  • Application of basement layer: you may add some basic primer to strength the closure and permeability.
  • Multi-layer application: apply the coating on the substrate evenly, and then apply with vertical direction for next coating. The surface drying time is about 12 hours, the waiting time base on the first layer which touch to be non-stick, generally apply 2~3 times (or according to the design requirements).
  • The thickness of the coating should be 0.5~0.8mm.
  • Recommended application for substrate: primer: principal material = 1:2 (weight), apply after mixing.
 
-13_222.jpg-13_.jpg

 

 

 

 

 

Assessed Factory

AAS.jpgfactory 5.jpgfactory 6.jpg 2 factory.jpg

 

 

In the exhibition

Exhi.jpg

 

 

 

Our Honor and MSDS

honor.jpgMSDS.jpgtest.jpg

 

 

Packaging & Shipping
  • By sea in Container
  • LCL: Wooden boxes
  • FCL: Floor layer is wooden boxes, Second layer is wooden pallets.

 QQ20140621094912

 

 

 

Why choosing us:                                               

  •  One of top 3 building waterproof material manufacturer in China.
  •  Professional and powerful R&D team to support technical service.
  •  Four big factories are distributed in  4 big areas of China.
  •  Get involved many big projects in China and Southeast Asia ,such as subway,tunnel,civil building,comercial  building etc.
  •  Excellent exported experience,exported to America,Australia,Russia ,Europe,Malaysia,Dubai,Middle east etc.
  •  ISO quality and environment friendly certificate.

 

 

 

 

 

 

 

Contact.jpg


0.1883 s.