200L to 2000L 2 4 layers PE Plastic blow moulding machine for drums

Share on (60332043909):


Price:RUB 16,832,244.00 - RUB 19,127,550.00

Quantity:


Product Overview

Description

Company Information

 Weifang Sehenda Machinery Co., LTD is major in plastic machinery and is one of the biggest manufacturer of plastic hollow units. Its main product is plastic machinery. The main products of plastic machinery are automatic hollow plastic unit, pull units, film unit, strapping machine, crusher, extruder. Its annual sales are nearly 100 million yuan. The company focuses on new product development and technological innovation.And the company has developed hollow units of 25L,50L, 125L, 150L, 220L, 500L,1000L,2000L,3000L,5000L in sequence. Supply comprehensive, timely and thoughtfulservice to the whole customers by our service R&D center.Full range of services throughout includes helping clients with early market research, selecting appropriate models, designing plant layout & equipment layout, Determining the auxiliary equipment, selecting and providing appropriate processing technology and product testing, etc.

 

DSCN1711_

 

Product Description

 

 

 

XHD2000L   one layer

XHD2000L   double layers

XHD2000L   three layers

Max. product volume

L

2000

2000

2000

Screw diameter

MM

One140

Two120

Three110

Screw L/D ratio

L/D

30:1

30:1

30:1

Screw drive power

KW

132

Two 90

Three90

Screw heating capacity

KW

30

40

60

Screw heating zone

ZONE

9

14

21

Output

KG/H

360

480

500

Oil pump drive power

KW

45

45

45

Clamping force

KN

1400

1400

1400

Mould open space

MM

3200

3200

3200

Mould thickness

MM

1220

1220

1220

capacity

L

70

70

70

Die head capacity

KW

40

45

48

No. of heating zone

ZONE

5

5

5

Die head material

38 CRMOALA(accumulator,   lining, piston, die)

Control action

MITSUBISHI PLC

Blowing pressure

MPA

0.6

0.6

0.6

Cooling water pressure

MPA

0.2

0.2

0.2

size of machine

MM

(L*W*H)(MM)

Weight of machine

MT

28

33

36

main unit

 

LOW-VOLTAGE APPARATUS

SIEMENS

GERMANY

PNEMATIV

AIRTAC

TAIWAN

HYDRAULIC COMPONENT

YUKEN

TAIWAN

SEAL

DZ

TAIWAN

OIL MOTOR

SIEMENS

GERMANY

SCREW MOTOR

SINMENS

GERMANY

PROXIMITY SWITCH

OMRON

JAPAN

PLC

SIEMENS

GERMANY

TOUCH SCREEN

PROFACE

JAPAN

WALL THINKNESS CONTRAL SYSTEM

MOOG

JAPAN

FREQUENCY CONVERTERS

ABB

SWEDEN

Specifications

 

1. Can Blow PE or HDPE (recycled)

2.100% Moog , Siemens Drive Motor , Siemens PLC.

3.ABB Frequency Convert, Yuken

 

 

XHD2000L Drums/Jerry cans/ water tank blow moulding machine

 

Professional service:

  

 

HTB18Pp0GVXXXXaRXpXXq6xXFXXXq.jpg_.webp

 

ENERGY CONSUMPTION

EXTRUSION MOTOR POW.

165KW

55KW*3

OIL PUMP POWER

55KW

 

SERVO PUMP POWER

7.5KW

SEPARATELY FOR PARISION CONTROL

BARREL HEATING POWER

90KW

24 zone

HEAD HEATING POWER

50KW

DIE HEATING SEPARATELY

COOLING FAN POWER

2.625KW

0.125KW*21

TOTAL POWER

370.125KW

FOR ALL ENERGY CONSUMPTION LISTED ABOVE

AVERAGE CONSUMPTION

200KW

FOR NORMAL WORKING AUTOMATICALLY

 

Certifacation

1679711806_.jpg

 

Packing & Shipping

 

Packaging Details:  Proper packaging for voyage 2*40 Open top container.

Delivery Detail: 3-6 months after received your deposit. 

Installation

The Seller will dispatch an engineer and translator against the requests of the Buyer to install and adjust the machine for 10 days in the Buyers factory. 

 

The Buyer need to inform the Seller 15 days in advance.

 

The Buyer should pay for the engineer and translators visa application cost, round- tickets, food & accommodation before their departure.

 

Training

The Buyer could dispatch their operators to the Seller’s factory for training, including machine operation, maintenance & simple repairs;

 

Or against the requests of the Buyer, the Seller’s technician could train the Buyer’s operators in the Buyer’s factory in the periods of installing & adjusting;

 

The training is free of charge.

 

Guarantee

 

The guarantee time is one year after the machines normally works in the Buyer’s factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.

Any problem caused due to irregular operation or incorrect maintenance by the Buyer won’t be listed in guarantee coverage.

  

 

 

Full production process

 

 

FAQ

 

 

Weifang Xinhengda Machine Co., Ltd.

Add: Shibu Industrial Park Changyi City Shandong ProvinceChina 

 

0.0893 s.