Non solidify rubber bitumen waterproofing coating/paint for shower

Share on (60454684615):


Price:RUB 2,973.09 - RUB 5,202.90

Quantity:


Product Overview

Description

Non solidify rubber bitumen waterproofing coating/paint for shower //www.hbchaoda.com/

Our main catalogue: 
1. Construction Waterproof Coating
2. Building Waterproof Membrane
3. Road Sealing Waterproof Materials
4. Telecom Power Tape(Insulation Tape, Waterproof Tape)
5. Butyl Rubber Sealing Clay

 

Product Description

Non-curing rubber modified bitumen waterproof coating
is our company's new development and production of a new type of waterproof material. The material is one component waterproof coating that made by powder, polymer, asphalt and other materials through special modifier and annexing agent.
After long-term exposure to air,non-cured rubberized asphalt waterproof coating don’t curing, insoluble in water, have high bond strength, able to adapt to the complex construction operation; it can automatically search for leaks parts repair damaged the waterproof layer, to keep permanent leak proof; doesn’t contain solvents, meet the requirements of national security, environmental protection.

It has outstanding creep properties, good waterproof performance, ageing resistance, can use daub, spraying and plasma, and other methods.It can use with coil to form composite waterproof layer;and can also be alone as a waterproof layer, surface should be attached to the isolation layer.

 

Characteristic:

 

1. Excellent creep properties

2. Excellent bonding performance

3. Excellent self-healing property

4. Excellent wet construction at the grass-roots level

5. Excellent resistance to chemical corrosion resistance and aging resistance

6. Superior environmental performance 

 

Application:

  • industrial and civil building roof and side wall waterproof engineering
  • planting roof waterproof engineering
  • underground structures, subway station, tunnel waterproof engineering
  • road bridges, railways and other waterproof engineering
  • dams, water conservancy facilities and other waterproof engineering
  • deformation cracks, settlement joint and other crack grouting filling and sewing
Technology Data:

 Non-cured rubber asphalt waterproof coating/paint

Construction points :

1.Clean up the grass-roots

When the surface of the grass-roots level obviously uneven is suitable to  use cement mortar screeding;  Through the pipeline of the waterproof layer, embedded parts and equipment foundation shall be buried before the waterproof layer construction and installation.The gaps between the pipeline and structure should plugging tightly of fine stone concrete or polymer waterproof mortar.Use a broom or hair drier to clean up grass-roots mortar and construction  waste.Acceptance of the basic level should smooth,  solid, drainage slope comply with the design requirements, grass-roots level can  be wet but can  not have  water on the surface.

2.Detail parts additional layer construction

The place such as roof rainwater mouth, the roof tube root, the inside and exposed corner of parapet and gutter firstly blade coating 1mm non-cured rubberized asphalt waterproof coating to make strengthen. 

3.Coating construction

Coating can choose blade coating or spray coating construction, open extrusion pump, to squeeze non-cured rubberized asphalt waterproof coating to the grass-roots, blade coating evenly  and full coating not exposed base,  coating thickness according to the design requirements.

4.Pave coil

Then paving the coiled material to waterproof coating surface that has completed the construction , it should laid straight, smooth, no wrinkle.Coiled material lap width is 100 mm,overlapping parts adopt cold stick form, then blade coating or spray 

coating non-cured rubberized asphalt waterproof coating on the coil lap width range, no need  table dry time, can be directly construction overlapping parts of the coil, and rolling.

5.Water-storing test

After the completion of the waterproof layer, water storage experiment was carried out in accordance with the regulations.

Storage 24 hours no leakage water is qualified. 

6.The construction of protective layer

The quality of roof waterproof layer can be qualified acceptance, protective layer construction can be going.According to

design requirements do the corresponding concrete, block material or cement mortar layer.

Non-cured rubber asphalt waterproof coating/paint

 

Transportation and storage :

 

To save the material in a dry indoor ventilation

To prevent the sun and rain and avoid collision in transportation

The shelf life of product is half a year, exceed the shelf life should re-inspection when qualified can be used

Products Show:

 

3.jpg

 

Non-cured rubber asphalt waterproof coating/paint Non-cured rubber asphalt waterproof coating/paint

.jpg

 

Non-cured rubber asphalt waterproof coating/paint

Non-cured rubber asphalt waterproof coating/paint

 

Non-cured rubber asphalt waterproof coating/paint

 

Our Services

 

Selling Points/Reasons for choosing us:

(1) Our warranty period is one year against the date of shipment.

(2) Free samples of  semi-conductive adhesive tape are available for your closer checking.

(3) Well trained and experience sales manager to help you with any of your requirement.    

(4) Professional R&D team, strong technical support.

(5) We have all specifications of our products and can meet customers’ product diversity needs.

(6) We prefer to accept your lower MOQ in order to relieve your purchasing stress.

(7)Our markets are widely distributed to North Europe, East Europe, West Europe, North America, South America, East Asia, Southeast Asia, Middle East, Australia, etc. and enjoy good reputation.

Our service:

(1)You can order online from us for 24 hours, 7 days.

(2)Our experienced staff answer all your questions in professional and fluent English.

(3)OEM&ODM products and customized design are available and welcomed.

(4)Our shipping team can make sure that our customers around the world receive the hundreds of orders shipped daily from our warehouse on time and as promised.

0.2209 s.