Cooled Chiller Cooling Water Condenser Tube Ball Cleaning System
Performance requirements
1, the amount of cleaning devices shall serve to ensure that all balls reach the front plate of the condenser of time differences within 5s so that each ball while cleaning a variety of tubes.
2, cleaning devices should be properly recycled rubber balls, missed the ball, and no accumulation of goals.
3, ball catchers water resistance: when nominal rated current is less than 3.0M/s, catching the net clean, local resistance loss in the 0.5Mwithin the water column.
Requirements of central air conditioning circulating water system filter
1. The accuracy of filtration is diameter 1.5mm;
2. Effective filtration area is more than three times of the actual cross-sectional area, see the provisions of 8.4 standard HG / T21637-1991.
3. Before the formal running of online cleaning device, you must wash and clean up the whole piping system, including the filter and other parts at the pump inlet (the accuracy of filter must be less than 5mm), exclude welding slag, iron wire, wood, plastic and steel oxide and other impurities caused during the installation process, drain the yellow rust water of the system.
4. Online cleaning device cannot replace the function like corrosion inhibition, sterilization and algae removal of chemical water treatment, so even installing the online cleaning device of condenser the chemical water treatment is still needed, but you can increase concentration ratio and decrease the discharge of concentrated chemical water.
1.10% minimum and up to 40% maximum energy saving, ball receiver rate up to 99%
2.Disposable investment costs can be recovered within a year
3.Automatic online cleaning, ensure no any fouling and corrosion of condenser
4.Prevent and eliminate abnormal high pressure occurred by running air conditioner
5.Increase the service life of the compressor and pipeline
6.To ensure maximum heat transfer efficiency of Condenser
7.Complete physical treatment, chemical treatment cost savings, protecting the environment
8.PLC computer program to control the entire process, no special maintenance technician needed, adjustable automatic cleaning times of Condenser every day
The rubber balls are sent into the condenser by feeder ,rubber ball relies on the high flow rate of cooling water to scrub off fouling from heat exchanging copper tube of condenser,
The ball collector will collect the rubber balls at outlet cooling water, the balls will come back to the collecting-driving device through collection pipe, which will form a cleaning cycle.
Cleaning frequency is set by Siemens PLC intelligent control box to realize automatic on-line cleaning and keep the internal wall of condenser be clean, which will also realize the highest heat exchange efficiency and highest cooling effect on cooling water machine.
Package: wooden cases into container
Delivery: 7-10 working days after deposit received in advance
Shipping methods: FOB Shanghai or by air


New products from manufacturers at wholesale prices