Share on (60658451108):
LMS open cell ceiling roll forming machine
Aluminum building material open ceiling making machine






INSTALLATION, MAINTENANCE AND OPERATOR TRAINING
1. Guarantee Period:
1) In correct operation & maintaining, excluded the electric elements, guaranteed against malfunction due to manufacturing defects for 12 months from thedate of loading. Repairs will be made free of charge.
2) Repairs will not be performed free of charge even during the guarantee period in the following circumstances:
Damage occur due to a natural disaster.
Malfunction occurs due to user error.
Malfunction occurs due to modifications.
Malfunction occurs due to further movement or shipment after installation.
2. Seller is responsible for installation and adjustment and buyer covers installation cost as followed by T/T or cash before or on engineers' visit.
1) Round trip air tickets fee
2) At least three stars hotel and food will be charged to the buyer account.
3) The seller technician salary for installation machine: USD 100.00 / person / day (with 10 days); and USD150/day/person/over 10 days.
4) Round trip transportation cost from hotel to the buyer factory, necessary communication and insurance, etc.
3. Buyer must make preparation before seller's engineers visit:
1) Power Supplied: 380V, 50 Hz, 3Phs
2) Underground cable trucking, lubricant greases.
Contact me:
Whatsapp/Tel: +86-13434117128
Wechat: 1028257502
New products from manufacturers at wholesale prices