Share on (60712767314):
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t | \t | \t | \t | \t |
| \t | \t | \t | \t | \t | \t |
| \t | \t | \t | \t | \t | \t |
| \t | \t | \t | \t | \t | \t |
| \t | \t | \t | \t | \t | \t |
| \t | \t | \t | \t | \t | \t |
| \t | \t | \t | \t | \t | \t |
| \t | \t | \t | \t | \t | \t |
| \t | \t | \t | \t | \t | \t |
| \t | |||||
| \t | |||||
According to ISO9001 International Quality System, our company has established one set of complete and efficient quality insurance system.
Aotai does strict test to every product, and make them endure customers picking.
Packing with AOTAI Brand Wooden Case.
Shanghai port
Ningbo port
EXW
*Choose the right Model
*Confirm your electric power supply ( Voltage, frequency and phase)
*Confirm the beveling angel required
*Confirm the welding joint required (U, V, Double V or Compound preparation)
*Advise your pipe material ( Carbon steel, stainless steel or others)
*Other special demands about machine
*The spare parts needed
*If the pipe wall thickness more than 30mm, inform us in advance (Important)
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. Or 30 days , it's depand to quantity.
A:
1) T/T 50% deposit, the Balance shall be paid after the goods inspected but before the shipment;
2) If all the cost is less than USD $ 10000, T/T 100% required in advance.
New products from manufacturers at wholesale prices