Share on (60814357473):
New Designed Concrete Reclaimer Sand Stone Separator for sales


Introductions:
1. Concrete reclaimer also named concrete reclaiming and slurry recycling equipment, is the core equipment in concrete recycle system.
2. It mainly used to sewage and residual concrete after cleaning the tanker.
3. Helps customer solve the problem of waste concrete pollution and conserve resources; Saves resources and protect the environment, mixing station is the best supporting green energy products.
Structures:

Main Features:
1) Simple structure in linear type ,easy in installation and maintation.
2) Adopting advanced world famous brand components in pneumatic parts ,electric parts and operation parts.
3) Can be used to match the concrete batching plant and also can be used indenpendently.
4) Can be equipped with the mixing tank for better performance.

Specifications:

Detailed Informations:

Company Informations:
1. Henan Mind Machinery Equipment Co., Ltd. located in Henan province, Zhengzhou city - industrial hub in China.
2. The items of our company sell well throughout the country and are exported to Southeast Asia, Africa, Middle Asia, Europe, America and so on.
3. After years of hard work, the company has established a complete and effective service system, and has built an experienced service team to provide free planning for customers. Design and installation of basic diagrams and flow charts, provide professional technical training.
Certifications:

Delivery time | Within 7-15 working days after receiving your payment; |
Payment terms | T/T, L/C, Western Union, Trade Assurance; |
Packing | a. Machines are wrapped in plastic film first before packing, which is to avoid moisture on the sea; b. The machines are put in standard export wooden case, lined with metal wire if necessary. |
Quality Guarantee Terms | Quality guarantee term is for one year. Malfunctions caused by machine itself and quality will be responsible for our manufacturer. Other malfunctions caused by operation mistakes, man-made problem etc., we won't take responsible. |
Q1. How to place an order?
A:Inquiry ---------> Quotation -------->Price reasonable ------->Check with specification ----->ProformaInvoice sent ------------>Payment made -------> Producing the items ------->Product shipment -----------> Customer confirm
Q2.How long is the delivery date?
A:Generally, the goods will be sent to our customers within 30-45 days after receiving the payment. Of course, it also depends on your quantity.
Q3.Is it possible to visit your factory?
A:Sure,welcome to visit our factory and we will pick you up at the airport or railway station and show you around our factory.
Q4.Do you have stock for all items?
A:In general, we have some stock, while if you need a bulk order, we still need time to produce it. Of course, we will inform all details you before your payment.F
Friendly Reminder:
Dear friend, if you have any questions about the size, feel free to contact us.
Leave me a message at the bottom, tell me your detail requirement. Trust me ,you will get the most suitable product and price .
New products from manufacturers at wholesale prices