1,The company strictly in accordance with the signed device configuration and technical requirements,
According to the national industry standard for design and manufacturing, and guaranteed to the user's device is compliant qualified products.
2, After the commencement of the contract, within ten days of the equipment design and manufacturing company,Enduser installation process coordination, convergence, and inspection;Business contacts on both sides of the letter have to be back within 8 hours.
3, In accordance with the mutually agreed time and the cycle for equipment installation, and commissioning.
4, Equipment quality and shelf life of one year, the vulnerability is not within the guarantee period.
Package of quality roller shelf life of six months.Refers to all goods shipped to the user The date of
acceptance for the quality of shelf life.
5, The quality warranty period, the company free of charge to provide the necessary technical services,
Occurred as a result of equipment design, manufacturing quality problems lead to equipment, the company will Responsible for replacement and maintenance.
6, After shelf life, the company to provide customers with technical services for life, and long-term To price and quick delivery of spare parts, spare parts.
7, The company responsible for all production technologies and installation, conferred to production workers, Ensure that the church workers to operate.